Work comprise of the construction of a maternity hospital (Bright point hospital) in an existing tower, Tower B of Al Jazirza facility in Muroor Road, Abu Dhabi. Conversion of an existing tower building G +15 to hospital facility. The scope includes structural strengthening works, structural modification works, civil concrete works, masonry & dry wall partition, metal, wood and glass works, thermal and moisture protection, Doors, windows, Flooring and ceiling, Specialties, construction systems elevators, and Electrical/ELV system , information and communication medical engineering works including medical gas system
© Copyright 2024 All rights reserved.